Cattalini

portuguêsenglish
historia

General Procedures Management

2.1 Request for Access

All requests must be addressed to the Commercial Department, and must indicate: Type of product, Type of Operation (Export/Import),
Amount of product, Type of tank required (stainless steel, carbon steel or carbon coated, schedule forecast of operation (starting and ending dates). Cattalini will reply within 3 working days.

2.2 Mooring Norms

In accordance with the Port Authority Regulation, APPA 072/01, the berth maneuvering procedures at Cattalini Terminal must observe the following information:

Outer Berth:

Maximum Length………………….235m
Minimum Length…………………..100m
Beam……………………………………. 40m
DWT………………………………………80,000 t

 

Inner Berth:

Maximum Length………………….190m
Minimum Length…………………..100m
Beam……………………………………. 25m
DWT………………………………………40,000 t

 

P.S.: All Vessels’ schedule is set by the Operational Management Staff.

2.3 Oil Derivates

Oil products can only be handled on Terminal 1.

2.4 Insurance

All Products warehousing are insured until expedite.

 

ANP Regulations | Links | Job Opportunities | Contact | Privacy Policy

Copyright Cattalini. Todos os direitos reservados. Desenvolvimento Livenet