History

    Terminal 2 

    Private Pier

    Parking 

    Localization

    Contact us!

    Certifyd

 

                                 
The terminal is fitted with:
  • Truck unloading station, capable of discharging 14 trucks at the same time with 7 different products.
  • Ttruck loading station, capable of loading 8 trucks simultaneously with 20 different products.
  • The terminal is connected to the railway network, by tracks which are able to accommodate 23 wagons and 3 products workable simultaneously;
  • 56 hydrants on a complete fire fighting system with a private fire brigade constantly trained.
  • Two electronic truck weighting scale with 60 tons of capacity;
  • Boiler for steam generation, for heating up products and for cleaning up tanks and lines;
  • Complete storeroom;
  • Laboratory;
  • Workshop;
  • Offices and other facilities;
  • Liquid nitrogen central ( inert gas system).
  • Effluents treatment facilities.